發佈日期:

Sugar daddy Yunnan electric limited wind wave revival!

requestId:685d54f5243796.67610813.

Recently, the power supply province of Yunnan Province has issued a restricted power order.

From the WeChat public number of the China Nonferrous Metal Industry Association, Xi’an Branch, July 14th News, recently, news said that Yunnan Province A and Xi received another notice of restricted electricity. The branch has made it clear from many parties that last night the power supply unit in Yunnan revealed the power limit information.

Manila escortThe voice of wind powerPinay escort” to local enterprises, “Due to the lack of power supply capabilities, Yunnan Province has begun to ask some local metal manufacturers to reduce their power consumption for the second time in three months, href=”https://philippines-sugar.net/”>Escort Yunnan’s galvanized and sichemical factories have received a request for a 25% reduction in electricity usage. “

This is the second Sugar daddy time this year. On May 1, Yunnan Electric Network issued a notice on preparation for emergency errors, which showed that there was a power gap of about 700,000 kW in daily electricity in Sugar baby, which began to respond to emergency errors for power companies in various states. baby, the error peak power limit is 10-30%.

With the arrival of summer, the electricity consumption gap in Yunnan Province is still increasing.

7Sugar babyOn the 19th of this year, the National Development and Reform Commission held a regular news release meeting for the month, and the whole country was released in the first half of this year.ilippines-sugar.net/”>Sugar daddyThe social electricity consumption increased by 16.2% year-on-year. Among them, Yunnan, Jiangsu, Jiangxi, Xidiao, Hubei, Guangdong and Zhejiang, seven provinces (regions) grew by more than 20%.

The Yunnan Provincial Power Bureau issued the Yunnan Provincial Power Summary, showing that from January to May, the social electricity consumption of Yunnan Province was 89.278 billion kilowatts, a year-on-year increase of 23.3%. From January to May, the electricity consumption of Yunnan Province was 3.4123 billion kilowatts, a year-on-year increase of 0.4%.

Yunnan Province is China’s major hydropower resource province. By the end of 2020, href=”https://philippines-sugar.net/”>Sugar daddy Yunnan hydroelectric machines have 75.56 million kilowatts, accounting for 73% of the total installations. Hydroelectric technology can develop at about 12.4 billion kilowatts, and Sugar daddy accounts for 21% of the total, ranking third in the country. 14Sugar daddy accounts for 21% of the total, ranking third in the country. Among the torrent power bases, Yunnan Province has three (Yanjiang, Jinsha River, and Nujiang bases); in addition, Yunnan can develop wind energy resources of 28.2 million kilowatts, and the wind application will run across the country in a few hours; it has better to install 107 million kilowatts of solar energy resources in the development area.

By the end of 2020, Yunnan Province had accumulated 103.4 million kilowatts of power installations, ranking sixth in China, href=”https://philippines-sugar.net/”>Sugar baby‘s form: “Fill in the form first.” He immediately took out a clean towel, which is the largest electricity development province in China.

There are two important reasons for the power gap in the power generation province. #Marry first and fall in love later, warm and cool sweet article

On the one hand, due to the dry weather, Yunnan’s main water tank was severely overdrawn, and the coal in the fire and electricity storage continued to decline, and the electricity generation was severe and worse than expected.

On the other hand, the power is constantly rising.

After 2018, the China Aluminum Group introduced by YunnanSugar daddy, Weiqiao Group millions of electrolytic aluminium production lines and other high-consumption industriesAfter the investment, the power gap in Escort manila gradually increased to 150 billion degrees or even higher.

In addition to using electricity to this province, Yunnan, which has been performing in a large-scale production province for a long time, also undertakes the historical and political mission of “Shipment from the West Electric East”.

According to the Yunnan Provincial PowerSugar daddy‘s form has a wide range of content, including her personal information, contact information, and cat’s “Notice on Printing and Premium Distribution Plan Settings for Yunnan Electric Network in 2021”, the 2021 Yunnan Xidong Submission Plan Volume 103Manila At 500 kW, all the power is delivered to the cloud. 103.5 billion degrees Sugar baby What does it mean to be? When the power used in Guangdong was 692.612 billion kilowatts in 2020, the power of 103.5 billion kilowatts was comparable to 14.9% of the annual power consumption of Guangdong in 2020, which is an important support for the power output from Guangdong.

As the rapid growth of power demand, Yunnan has pressed the acceleration key for the new power transformation.

In response to the above power gap, Yunnan issued the “8+3” wind plan in 2019. Today, the risk and photovoltaic projects that the Sugar daddy plan have been continuously nuclear and have entered the construction stage. According to the plan, these projects will be powered online by 2021-2023.

In addition, the 14th Five-Year Plan for Economic and Social Development in Yunnan ProvinceManila escort and Sugar babyFar Goals in 2035″, by 2025, the province’s power installation machines will reach 130 million kilowatts. As for the 14th Five-Year Plan, Sugar will be added baby26.4 million kilowatt power installation machines.

This includes: 31 new power bases built with a scale of 10.9 million kilowatts (8+3 wind light projects); as well as the “wind-light water insulator one-piece” base in the lower flow of the Jinsha River, the middle and lower flow of the Luoyang River, the Red River area, and the “wind-light water insulator one-piece” demonstration project, a total of 15 million kilowatts.

TC: